5D/BIM project management

+ SAVE TIME
+ REDUCE COSTS
+ MINIMISE RISK

Based on our extensive experience, we offer you a comprehensive 5D management of your civil engineering project, from the beginning till the end.
Together with our partners, we provide accurate 3D/BIM models and scans, and seamlessly integrate them with financial and time dimension, for a complete overview and control of the project.

PROJECT PHASE

OUR SERVICES

OUR REFERENCES

BIM database
Collection of fundamental 3D BIM elements

Each 3D model element can contain a wide range of information about its properties, materials, prices, suppliers etc.

Preliminary design
Project startup
Conceptual 3D model(visualisation)

A base 3D model for visual presentation of the project to investor(s).

Conceptual BIM model

Conceptual BIM model is an upgrade of conceptual 3D model; it is equipped with information about costs and possible execution schedules. It serves as an investment evaluation, approximate financial and time plan.

Design
Pre-construction
Procurement
3D scanning of construction area/site

3D scan of the area serves as a background for creation of a detailed 3D model and it’s exact placement. 3D scan of existing object serves as a background for precise installation and/or equipment planning and placement.

Detailed 3D model

Detailed 3D model is based on 2D technical drawigns and/or a conceptual 3D model.

Detailed BIM model

Detailed BIM model is created from conceptual 3D model and/or technical 2D drawings, and provides exact quantity, cost and time information(by each individual model element). It enables early detection of eventual design flaws and unintended element collisions.

Construction
Monitoring
Coordination
Detailed BIM model for execution monitoring

An upgrade of detailed BIM model, which enables precise, real time execution tracking(planned vs. actual), accurate billing and prediction of expected financial and timeline deviations.

3D scanning of progress

Ongoing, detailed 3D progress scanning captures every detail of project construction/installation, and serves as an undisputable background for billing, monitoring, quality control (as well as maintenance once the project is completed).

Progress tracking and analysis

Real-time progress tracking, billing, control of executed quantities, analysis of planned vs. actual progress, analysis of resource usage, prediction of expected financial and timeline deviations.

Synchronisation of BIM model with actual elements/materials

Synchronisation of BIM model with eventual material/equipment quantity and type changes during execution.

Post-construction
Maintenance
Maintenance BIM model

Upgrade of BIM model with information relative to building maintenance during its entire lifecycle.